Infrastructure Preparations of the Prefabricated Pool
The area where the prefabricated pool will be built is marked according to the size of the pool.
One of the most important preparations in prefabricated pool construction is the smooth construction of the infrastructure. First, the area where the prefabricated pool will be built is marked according to the dimensions of the pool. Excavation is taken according to the project and c 30 concrete is poured into the area where the pool will be mounted. Concrete must be smooth and smooth. After the concrete casting process is completed, the assembly of the prefabricated pool frame is started.
After the pool case and machine room are completed, the liner coating application is made and the prefabricated pool is made suitable for testing. After filling the water and making the necessary tests, it is back-filled and made ready for landscape application.